Projects / Yoxel SW / Releases

All releases of Yoxel SW

  •  28 Oct 2008 13:04
Avatar

    Release Notes: The dependency on JPGRAPH was removed. The UI was improved. In the release/project manager, GANTT and Burndown charts were added. Tasks may be added into an on-going iteration. Tasks may be re-estimated in an ongoing iteration. The RequestTracker was updated, with a less restrictive default workflow. Email messages were simplified, with additional actions. "Filter" results may be ordered by the current owner. New dashboard charts were added. Many bugs were fixed.

    •  13 Aug 2008 05:28
    Avatar

      Release Notes: Better detection of required PHP/module configuration (Yoxel installation stage). TRAC bug tracker integration support. LDAP integration support. I18N related infrastructure enhancements. Bugfixes.

      •  13 May 2008 21:08
      Avatar

        Release Notes: This release continues to focus on improving the UI and ease of use. GANTT charts enhancements: reflecting holiday and off time, and more accurate drawing of time bars for tasks in state 'in_work'. An I18N related infrastructure is being put in place. You can graph foreign language text (including Japanese) now. An email integration utility allows you to connect to an IMAP mailbox and catch new requests and comments for attachment in Yoxel. There are many bugfixes related to the RMS/ITPM UI structure introduced in 1.21.

        •  11 Apr 2008 07:24
        Avatar

          Release Notes: This release is mostly focused on improving UI and ease of use. Prominent shortcut links were added to most common functions, such as Add User, Add Product, and Start Iteration. Prerequisite checks and guide alerts were added for a better first set-up experience. Guiding alerts were added for the project/iteration planning session. The system now guides you through the process of planning. Project manager now can account for holiday/vacation time (when a resource is not working) in addition to weekend days. Bugs were fixed.

          •  09 Mar 2008 23:56
          Avatar

            Release Notes: Adoption of UTF-8 character set encoding throughout all Yoxel code. An IT customer portal. A new navigation mode switch "Full/Normal focus". Polishing of recently added (1.19) capabilities and bugfixes.

            •  26 Jan 2008 05:23
            Avatar

              Release Notes: ReleaseManager/IT ProjectManager now has an enhanced filter-based 'add existing request' window, quick zoom in on decommits from previous iterations, the ability to scroll through the whole backlog without leaving the planning panel, and the ability to add multiple requests to your plan at a time. In KnowledgeBaseSystem, search output now is correctly sorted by score and key word highlighting was improved. In ReleaseManager/IT ProjectManager, Gantt and burndown chart progress is shown, an auto resource balancing mode for newly added requests was added, and some corrections were made to dashboard charts.

              •  26 Nov 2007 03:59
              Avatar

                Release Notes: YOXEL SLS is extended to include a new License Management System. This system allows you to automate the software license requesting/cutting process, as well as keep track of issued license files and their details. The contacts management part of the site has been enhanced with the ability to save filters. ReleaseManager/IT ProjectManager: the history panel is enhanced to allow any user to add himself to CC list, and the 'done' panel is enhanced to allow you to add URLs to relevant files and documents.

                •  30 Sep 2007 07:09
                Avatar

                  Release Notes: YOXEL SLS, a suite for sales teams, was added, providing sales forecast tracking and product evaluations tracking. CVS and Subversion were integrated though email comments support. Profile editing capabilities were added for customer/contact logins. Mail can be sent with SMTP, in addition to the standard PHP/sendmail based mechanism. The "yoxel-config.inc" configuration file was added. The Retrospectiva external bug-tracker is now supported. A number of bugs were fixed.

                  •  17 Aug 2007 20:31
                  Avatar

                    Release Notes: This release focuses on the dashboards engine. You can customize most of the dashlets now. A generic, highly configurable, filter-based dashlet has been added that can be used across all Yoxel modules. There is a unified product/component, environment/queue, and category/sub-category management panel. There are a few minor UI improvements in RMS/ITPM planning and tracking panels. There are some bugfixes.

                    •  11 Jul 2007 14:57
                    Avatar

                      Release Notes: This release continues to focus on UI improvements and bugfixes. The dashboards engine has been significantly enhanced. You can now rearrange, resize, or remove dashlets and portlets on your dashboard pages with drag-n-drop and a click of your mouse. Another pop-up window allows you to add dashlets to your dashboard pages. Bugfixes and other enhancements were done.

                      Screenshot

                      Project Spotlight

                      episoder

                      A tool to tell you about new episodes of your favourite TV shows.

                      Screenshot

                      Project Spotlight

                      BalanceNG

                      A modern software IP load balancer.